Product Details
Place of Origin: China
Brand Name: GBS
Certification: CE,UL,IEC62619,TUV,ISO9001,ISO14001,OHSAS18001
Model Number: GBS-LFP100Ah-E
Payment & Shipping Terms
Minimum Order Quantity: 4PCS
Price: USD80
Packaging Details: Special carton for dangerous goods
Delivery Time: 7 WORKDAYS
Payment Terms: L/C, T/T
Supply Ability: 3000000PCS PER YEAR
Battery Type: |
Lifepo4 |
Cycle Life: |
3000 Times |
Connector: |
Busbar, Lug, Screw, Bolt |
Warranty: |
2 Years |
Battery Type: |
Lifepo4 |
Cycle Life: |
3000 Times |
Connector: |
Busbar, Lug, Screw, Bolt |
Warranty: |
2 Years |
Please leave your message here, we will contact you soon.
No pollution during manufacture.
Item | Specification |
Model | GBS-LFP100Ah-E |
Pole screw hole | 4 holes |
Rated capacity | 100Ah |
Nominal voltage | 3.2V |
Internal impedance | ≤0.4mΩ |
Standard charge rate | 0.25C |
Fast charge rate | 1.0C |
End of charge voltage | 3.65V |
Standard discharge rate | 0.5C |
Max discharge rate | 1.0C |
Instantaneous discharge rate | 3C ( 10s ) |
End of discharge voltage | 2.8V |
Working temperature | -20~65℃ |
Cycle life | 3000 cycles ( 0.5C ) |
Weight | 2.3±0.1kg |
Dimension | 126×51×223±1mm |
Shell | PP |
Basic Performance
(1) Output with high efficiency: Standard discharge current is 0.3C-0.8C, instant impulse discharge current is 10C for 10 seconds.
(2) Good performance under high temperature, it could work under 65°C temperature.The battery structure is safe and good.
(3) Good performance under low temperature.discharge capacity decreases to over 90% under 0°C and discharge capacity decreases to over 70% under -20°C.
(4) Good safety performance:When the pressure inside the battery is too large, the one-way safety valve will release gas and heat to make sure battery perform well. When the internal pressure reaches a certain level, the valve will be open immediately which can protect the battery from burning and explosion.
(5) Good cycle life time, the discharge capacity is still over 80% after 3000 cycle times of single cell(80%DOD).
(6) It can fast charging. It could be charged to 80% within 0.5h and charged full with 2-3h.
(7) No pollution during manufacture and usage.
(1) Please check if spare parts are completed when open the package and read the operation manual carefully.
(2) Do not make the battery Short Circuit,do not over charge and discharge.
(3) Please charge the new battery to full capacity before discharge for the first use.
(4) The battery pack is fixed with plate and strip before delivery, do not disassemble the plate and strip when using the battery.
(5) Checking the voltage of battery, normally it is 3.2V-3.3V.
(6) Fix BMS for battery pack and protect single cell to avoid over charge and over-discharge.
(7) Rivet or screw is used for battery connector.
(8) Please use copper part to connect battery packs and fix with hydraulic pressure plier. We could also provide the relevant connection which fixed with screws.
(9) The charger used should be approved by our company in order to match with our lithium batteries.
(10) It will shorten battery cycle lifetime and damage battery due to overcharge and over-discharge if not do according to the above. It won’t be within our company warranty.
Requirement for safety assurance
For the sake of safety assurance, please discuss the equipment design, its system and protection circuit of Lithium-ion cell advance. And consult about the high rate current, rapid charge and special application in the same way.